[C++]
The SetAsMultipleDaysReportJob method sets the
report job to run on specific days of the week starting from a
specified date.
HRESULT SetAsMultipleDaysReportJob(
FpcDaysOfWeek Days,
FpcReportJobPeriodType PeriodType,
DATE StartDate
);
Parameters
- Days
- [in] Bitmask of the FpcDaysOfWeek enumerated type that
specifies the days of the week on which the report will run.
- PeriodType
- [in] Value from the FpcReportJobPeriodType
enumerated type that specifies the type of period (such as a day, a
week, or a month) that each report will cover. The value
fpcReportJobPeriodCustom, which is reserved for report jobs that
run once, is not allowed.
- StartDate
- [in, optional] Date value indicating the day on which the
report will start being generated. The default value is the day on
which the report job was created.
Return Values
This method returns S_OK if the call is successful; otherwise, it
returns an error code.
[Visual Basic]
The SetAsMultipleDaysReportJob method sets the
report job to run on specific days of the week starting from a
specified date.
Sub SetAsMultipleDaysReportJob( _
ByVal Days As FpcDaysOfWeek, _
ByVal PeriodType As FpcReportJobPeriodType, _
[ ByVal StartDate As Date ] _
)
Parameters
- Days
- [in] Bitmask of the FpcDaysOfWeek enumerated type that
specifies the days of the week on which the report will run.
- PeriodType
- [in] Value from the FpcReportJobPeriodType
enumerated type that specifies the type of period (such as a day, a
week, or a month) that each report will cover. The value
fpcReportJobPeriodCustom, which is reserved for report jobs that
run once, is not allowed.
- StartDate
- [in, optional] Date value indicating the day on which the
report will start being generated. The default value is the day on
which the report job was created.
Return Values
This method has no return values. If the call is unsuccessful,
an error is raised that can be intercepted by using an error
handler.